Power for AI data centres

The Physical Layer

AI's limit is power.

Demand for power has outrun the grid, so AI data centres look for a faster way in or build their own. Every way around the grid has its own queue: the equipment makers, the turbine makers, the winter night and the reactors' fuel. This journal follows that one problem in seven chapters, from the grid connection to the reactor, from primary sources.

Read the chapters in order, or follow the power stop by stop.

  1. Chapter 1 · The grid connection

  2. Chapter 2 · The grid connection

  3. Chapter 3 · Transformers and switchgear

  4. Chapter 4 · Power beside the site

  5. Chapter 5 · Power beside the site

  6. Chapter 6 · Nuclear power

  7. Chapter 7 · Nuclear power

Or follow the power, stop by stop.

Chapter 1 · Johor and Singapore

It starts with a wire

Power for an AI data centre arrives over high-voltage lines from the public grid. In Johor and Singapore, the right to draw that power, not the supply of chips, now decides who gets to build.

Chapter 2 · America rations the plug

The grid rations the plug

High-voltage power arrives from the public grid through a substation built for the site. In America the grid now decides who waits, who is cut first and who pays.

What binds. The wait for a connection now runs to years, and the grid decides who is served first.

Chapter 3 · The equipment queue

The machines at the gate

Transformers step the voltage down at the grid and switchgear routes and protects it inside the fence; a handful of makers build them.

Chapter 3 · The equipment queue

Built to order, not to stock

Nothing switches on without them, and they are made in a handful of factories, so the grid cannot simply build its way out.

What binds. The makers add factories only as fast as signed orders justify, so the wait is kept, not cleared.

Chapter 4 · Building your own power

So build power next door

Builders skip the grid and make their own power beside the building: gas turbines, engines and fuel cells.

Chapter 4 · Building your own power

And meet the turbine queue

The heavy gas turbine is the core machine, and its makers are selling slots in 2032.

What binds. Skipping the grid queue means joining the turbine makers' queue instead.

Chapter 5 · Solar and batteries

The fastest power there is

Solar farms and batteries are most of what America planned to build in 2026. A battery takes about a year, a solar farm about two, and nobody waits in the turbine makers' queue.

Chapter 5 · Solar and batteries

But not through a winter night

An AI data centre draws nearly the same power at 3am as at 3pm. PJM counts a megawatt of tracking solar as 7 per cent of a firm one, and a four-hour battery as 57 per cent.

What binds. A four-hour battery reaches the evening, not the night, so buyers turn to power that runs all year.

Chapter 6 · Nuclear for AI

Power that runs all year

Existing reactors, restarted or upgraded, sell power to AI campuses first; new and micro reactors follow.

Chapter 7 · Microreactors

The reactor is the easy part

Microreactors are small enough to build in a factory and drive to a site. What paces them is the fuel, not the machine.

What binds. Most new reactors need a richer fuel, HALEU, that America makes on one demonstration line.

The whole chain

Every answer is a queue

The grid, the machines at the gate, the turbines, the winter night and the reactors' fuel: each way to the next gigawatt for AI has a queue of its own. The slowest one sets the date.